#7/2462
Replacement of TB-3 Mooring System (Anchor Piles & Chanis)
- Theme
- Offshore
- Client
- ADNOC Offshore, UAE
- Status
- Ongoing
- Contract Type
- EPC
Scope Of Work
Installation of 6 No. Anchor Piles, 6 No. Anchor Chains & 1 No. Wave Height Measurement System.
- Removal of 6 No. Existing Anchor Chains, 6 No. Existing 30 Ton Clump Blocks & 6 No. Existing Anchor Piles at Mudline level.
- Modification and Integration with existing RTU and DCS.